Agriculture is the main source of livelihoods for most of the households in rural areas in the State of West Bengal in India. However, irrigation system is not developed in most of the places and the farmers mainly depend on rains and exploit ground waters to irrigate their crops. The rural population in West Bengal is about 62 million.

Thousands of water-bodies like rivers, streams, channels, lakes, ponds, swamps of various shapes and sizes are to be found across the state of West Bengal. Most of these water bodies are located on the land owned by Government of West Bengal and primarily engendered by rainfall during rainy season.

Despite receiving moderate to heavy rainfall during rainy season of about 3 months in a year, which often causes devastating floods at many places, there are no concerted efforts for development and management of the water bodies for productive use. The water bodies can be converted to water reservoirs and be operated for the purpose of irrigation, water supply, flood control, fisheries, recreation (like boating) and electricity generation by setting up hydropower plant under Public Private Partnerships. A large numbers of the water bodies have already been repaired, renovated and restored under Mahatma Gandhi Rural Employment Guarantee Scheme (MGNREGS), the flagship programme of Government of India to provide minimum 100 days works in a year to every rural household to do unskilled manual work. De-silting of the water bodies, excavation, peripheral embankment, construction of small scale engineering structures like check dam, anicut, escape, weir, trenches, intermediate and linked drains, diversion channels etc have been carried out in many water bodies under MGNREGS. However, utilization of these water-bodies in a professional way under PPPs to help deliver better services to the people by means of irrigation, water supply, flood control, fisheries and hydropower plants is hardly given a thought.

PPPs can be very effective and efficient approach for development, operation and maintenance of water bodies to serve the above-mentioned public purposes. Government of West Bengal owns most of the water bodies; but it lacks money and manpower resources to develop, operate and maintain such water-bodies scattered across the length and breadth of the State.  Small and Medium Private Enterprises will be suitable for these kind of PPPs. Preferably, local unemployed persons can form private enterprise to develop and manage these projects. The requirement of capital investments to develop and manage the water bodies to serve the intended purposes are not very high and can be sourced by private enterprise as loan from the Banks / Financial Institutions.

The responsibility of Government of West Bengal would be to identify the water bodies and to prepare Detailed Project Reports to assess the technical feasibility and economic viability of the scheme. Since the water-bodies belong to Government of West Bengal, there is no requirement for land acquisition for the Government. 

The scheme may be auctioned for allotment to the private party based on the selection criteria of the highest percentage free sharing of the produce / output of the project by the private party with the Government. Private partner will also need to pay upfront premium to the Government of West Bengal at the time of allotment of the project which may be decided by the Government based on the economic viability of the scheme. There will be a fixed concession period after which the project will be re-auctioned. The private partner will earn revenues from the users of waters for irrigation and water supply, recreational users, fish production, electricity generation etc as the particular scheme is intended for. 

The entire development and operational risks as well as demand risks will rest on the private partner.  

The tariff for the water use will be determined by the market i.e. mutually-agreed tariff by the project proponent and the prospective users; so as the price of fish produced and tariff of the electricity generated by the project. 

Irrigating crops from such schemes would be cost effective to the farmers during non-rainy season because, due to over-use, the underground water levels have already been dropped substantially and it requires high installation, operation & maintenance cost to extract ground water using pump sets. During summer time the pumps often fail to extract water.

Government of West Bengal, initially, may take up some water bodies for development and management through PPPs on pilot projects basis.

Sample Photograph: A Lake in West Bengal, India                       